Blog
Discover our latest articles and blogs

September 14, 2026
SMR Costs Boards Must Budget: $4,000–$18,646 per kW, 25–40% FOAK
Actionable cost bands for decision-makers: plan NOAK base near $3,985–$4,844/kW, expect a 25–40% FOAK contingency, LCOE ~$80–$90/MWh, and model IRA scenarios.

September 13, 2026
150–300% ROP Gains Make Geothermal Drilling Viable for Engineers
Newberry field data show 150–300% ROP gains and tools surviving above 300°C. This technical synthesis links those metrics to design choices and R&D...

September 12, 2026
15%–25% EBITDA: What Investors Must See Before Funding a Vertical Farm
Investor checklist for vertical farm financing: verify the thresholds that matter, including 15% to 25% EBITDA, energy below 30% of OPEX, crop turns, and...

September 11, 2026
Human in the Loop AI: Five Step Oversight Checklist Before You Scale
A practitioner focused take on Human in the Loop AI: five step oversight checklist, layered controls, and when to require human approval before scaling.